97夜夜澡人人爽人人喊

      <object id="i4gvb"><nobr id="i4gvb"></nobr></object>

        <code id="i4gvb"><sup id="i4gvb"><sub id="i4gvb"></sub></sup></code>
        <code id="i4gvb"><small id="i4gvb"></small></code>
        1. BMW K1200S

          detailed pictures of footpeg kit installed
          Return to K1200S Page


           

          Left Side


          The turnbuckle rod from the shifter to the transmission
          is shortened to lower the working end of the shifter.

          Right Side

          Here the linkage extender is installed between the lower
          clevis and the actuating rod leading into the master cylinder.
           

           


          Use the new bolts to attach the adapter to the frame.
          Use the factory bolts to attach the peg carrier casting
          to the adapter.

           

           


          In this picture the master cylinder is tied into the sub-casting
          with two hex head bolts and one factory socket head bolt
          with lock washer and nut.

           

          Kit is no longer available in black

           

           

           


          In this picture the notch in the stainless plate fits around
          the flange at the bottom of the master cylinder,
          upper left in picture.

           

           

           

           

           

           

           

             
             
             

          Return to K1200S Page


           

          97夜夜澡人人爽人人喊

              <object id="i4gvb"><nobr id="i4gvb"></nobr></object>

                <code id="i4gvb"><sup id="i4gvb"><sub id="i4gvb"></sub></sup></code>
                <code id="i4gvb"><small id="i4gvb"></small></code>